Peterhouse M Stair

Peterhouse College

This project presented many challenges due to poor access with very limited on site storage, particularly as it was also immediately adjacent to the the main vehicular College entrance gate. Alteration & refurbishment of the existing redundant building formed six new student bedsits with ensuite facilities & new kitchen area. Within the existing single storey building the works included the creation of an entirely new first floor with new oak stair access, structural restraint of the roof structure, re-roofing including forming 8no new dormers, reforming 8no ground floor window openings with stone head lintels & creation of a new gable window with stone surround, all with purpose made windows.

Total Contract Value: In excess of £250K
Contract Period: 16 weeks.